Project :Verification of Installed LED Street Lights, CCMS Panels, switch points and IDC Components in the state of GOA 

Guidelines for Outsourcing of Verification of Installed Street Lights for the State of GOA Only.  Register and Comment here if you are looking for vendorship Districtwise or Statewise... Only Two Districts are there in Goa: North Goa & South Goa.


Project Background: 

EESL is implementing the Street Light National Programme (SLNP) in the State of Goa through Electricity Department, Government of Goa (EDG) on a deemed savings model, wherein approximately 1.86 lac conventional street lights in South Goa and North Goa is retrofitted with LED streetlights along with the installation of Centralised Control & Monitoring System (CCMS) panels. 

Following is the details of the installation of LED streetlights:





Scope of Work:


 The scope of work essentially consists of following:-

Preparation and submission of detailed information/report as per the deliverables defined below and in reference to the EESL/EDG requirement.

(i) The verification exercise must record all the details such as installed luminaire wattage with pole number, pole type, GPS co-ordinates, bracketarm, clamps, wires, connectors, CCMS panels, earthing, and all related materials under this project in a specific document template (attached). It may be noted that if any old conventional lights are found during the verification, the same shall also be recorded separately.

(ii) The verification shall be carried out in a planned “Section-wise” and further switchpoint/CCMS wise manner. The locations details of the switching points without the CCMS panel installed for the LED streetlights if encountered shall be informed to EESL and the verification exercise of the same shall be performed after it is replaced with the CCMS panel.

(iii) During Field Survey, Electrical data of existing switch points i.e., voltage, current, power factor, power (kW & kVA), connected load using power analyzer and illuminance level using lux meter covering all categories in the area of the Electricity Department of Goa shall be analyzed and documented.

(iv) The verification exercise also needs to record the illuminance level (lux measurement) of the installed LED luminaire in various locations across various divisions of Goa as per the standard “9 Point Method” of the NLC. The quantum of lux measurements shall be for a minimum of 150 locations/switching points of various road categories/wattage of installed lights in each Division spread out across various sub-divisions.

(v) Studying and analyzing the existing Street Light conductor status, Feeder Point conditions.

 (vi) Improvement in quality of street lighting infrastructure through targeted infrastructure repairs and upgrades such as improved wiring and installation of feeder panels with appropriate power conditioning switch gear.

(vii) Studying and analyzing the conditions of earthling, underground cabling, Poles, installed Pole Arms, Pole Junction Box etc. and proposing any changes wherever required.

 (viii) The image capturing of individual installed LED streetlights and CCMS panels to be carried out during verification.

(ix) The deployed teams must be provided with all the necessary measurement instruments, vehicle, etc. that might be required for carrying out a proficient verification task.

(x) The concerned vendor will depute one person for daily reporting and discussion with Electricity Department regarding the survey in coordination with IEDCL/client.

 (xi) All the recordings during verifications should also be maintained in Word, excel, etc. formats for submission to IEDCL/client on daily basis.

(xii) For the convenience of locating the switch points by the verification teams, personal from the Electricity Department of Goa or the vendor would be arranged.




Key Deliverables along with the above scope of work as follows:


(i) Executive Summary (in hard copy as well as soft copy)

(ii) Section wise survey report to be segregated.

(iii) Daily sharing of the reports (as per the scope of work) in excel, pdf etc. format.

(iv) Digital mapping of Street Lighting field assets.

(v) Providing details of Type of Pole, Type of Brackets, Type of Mounting arrangement, Height of Pole and other infrastructure details.

 (vi) Providing Lux reports to identify the dark spots in the area and further propose (if any) additional infrastructure/Lamps for spot free illumination throughout the roads.

 (vii) Providing High Resolution Photographs of Individual field asset- (GPS Coordinate wise Photo Details in CD format).

 (viii) For the successful completion of the work all requisite resources such as lux meter power anal analyzer, vehicle etc. has to be arranged at no extra cost.



 DEPLOYMENT OF MANPOWER:


 For the above work company has to deploy sufficient manpower to complete the project in the allotted time frame of 8 weeks. For this it is essential to deploy 25 teams or above and achieve designated targets verification of 4000 lamp level survey per day.

Commercials:
Ø For the services rendered by the Outsourced Agencies, they shall be entitled for payment of Rs.10/- to Rs.15/- Price per Survey is provided to State Governments. This covers the cost of collection
of area survey, noting,entering and double checking of the correctness in the survey.

Ø The rates so fixed are inclusive of all taxes (GST), duties, and levies etc imposed by the State/Central Government and Local Bodies as on the date of award of the work. Nothing shall be payable extra under any circumstances. However, TDS will be deducted as per Income Tax.

Billing Cycle:

Ø Outsourced Agencies shall raise invoice on every month end to the Parent Company.

Ø The Invoice can be raised through e-mail or Fax and followed by hard copy.
Payment Processing:

Ø Payments to Outsourced Agencies will be done within 90 days from the verification report Issued by the designated authority.

Such verification Report shall be issued within 7 days from the date of invoice.
Training:

Ø Parent Company will not give the training to District Wise Vendors.
Ø Training will not be given to Vendor payroll surveyors.
Ø Vendor needs to employ the experienced surveyors to the field. 
Ø We need One Point Contact from the Selected District Vendor, they have to operate with Parent Company State Coordinator.
Ø One of the Government official will visit the Site for Authorization & Verification.
To Signup Work order:
Ø Signing up with PAN INDIA Company.
Ø Business Procurement Fees (Consultancy Charges) shall be discussed.

Document Required For Center (Outsourced Agencies):

Ø One Cancelled Cheque
Ø PAN Card
Ø Company/Firm Profile
Ø Company / Firm Service Tax
Ø Owner Address Proof
Ø Owner Id Proof
Ø Owner Photo
Ø Bank account Statement of 6 Months
Ø Bank Account Details(Company Account)



Note:  The Projections Shown here are assumptive and fictitious. It is about to change or edit or it may be more or less & it is not final. Author of the Document is nowhere responsible.

Mobile Payments by Fortumo

Comments

  1. Anyone please give me the present contact number of Mr Ram Babu ... I've lost a lot by Ram. He is a big lier also cheater. Presently his number is not working. Anyone please help me.

    ReplyDelete
  2. Hey Thanks for sharing this valuable information with us. I will come back to your site and keep sharing this information with us
    Dont Miss Best
    Led lights pakistan

    ReplyDelete

Post a Comment